the "everything else" list is getting smaller and there is a plan afoot to get the car back to my house over the winter to do some work on it.
I've been buying bits for it as I find them, so I think i have 80% of the bits needed to get the fuel system finished. Just need the bit for the end of the fuel rail to get it plumbed into the ZS pipe work.
After that it needs the rear engine bracket sourcing and the map downloaded into the DTA - I'm not getting my hopes up too much but it's almost ready to run. Well after i strip the top off the engine to lubricate everything again. It's not turned over in about 2 years
__________________
------------------------------
------------------------------
__________________
------------------------------
------------------------------
|