Doing a bit here and there. Some on the garage, some on the zed.
Garage now has led strip lights, what a transformation! Plumbed in water to front and back so the outside tap that now resides inside the garage now supplies taps for the back garden and driveway.
The zed has been prepped and ready for it’s polycarbonate windows, left off until the bodywork has been finished. Got the lightweight door panels to fit, all profiled.
At some point I will be contacting Matt Reidy regarding the possibility of dialling in the throttle bodies. It might be too much for him but unless I ask I won’t know.
__________________
------------------------------
------------------------------
__________________
Some useful links:
|