theMGZS.co.uk   Navigation

AboutNews Flyers Forum Events Home

Home
Go Back   theMGZS.co.uk :: MG ZS forum > Technical Area > Build Projects

Reply
 
Thread Tools Display Modes
Old 24-09-16, 09:05 PM   #1
Big-Jay
Member
 
Big-Jay's Avatar
 
Join Date: Jan 2016
Posts: 121
Big-Jay has a spectacular aura aboutBig-Jay has a spectacular aura about
Continued.

Back to the bodywork, I stripped the running gear both sides until I was left with the drive shafts and lower arms -



And then removed the front frame, ARB and the steering rack. I'll have the frame and ARB powdercoated -





Various brackets removed ready to be powder coated, was thinking X Power Green but I'll make a decision on colour when I get down to the shop -



With all that out the way it meant I could get started wire brushing. Here's the N/S cleaned up back to bare metal where it needed to be and hand sanded to provide a key elsewhere -











Jacking point after a good wire brushing, nice and solid -



And Zinc primed -













Well, that's all the work up until today. Will be back at it again tomorrow, the drivers side awaits the same treatment !

Jay.
Big-Jay is offline   Reply With Quote
Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT. The time now is 07:51 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Copyright ? 2010 theMGZS.co.uk