theMGZS.co.uk   Navigation

AboutNews Flyers Forum Events Home

Home
Go Back   theMGZS.co.uk :: MG ZS forum > Technical Area > Build Projects

Reply
 
Thread Tools Display Modes
Old 27-04-20, 05:46 PM   #1
stamford
Site Owner
 
stamford's Avatar
 
Join Date: Jul 2007
Location: Waterlooville, Hants
Posts: 24,097
stamford has much to be proud ofstamford has much to be proud ofstamford has much to be proud ofstamford has much to be proud ofstamford has much to be proud ofstamford has much to be proud ofstamford has much to be proud ofstamford has much to be proud ofstamford has much to be proud ofstamford has much to be proud ofstamford has much to be proud of
Furlough has meant some days spent working on the zed.
  • Rear suspension rebuilt with new bushes and paint, refitted.
  • Replacement rear ARB hangers fitted.
  • Rear brakes rebuilt.
  • Front brakes refitted.
  • All four wheels back on and on the ground.
  • Interior cleaned, stripped of sound deadening and painted.

Today I started stripping the top of the engine in readiness for the cambelt service and possibly fit the Piper Cams. Found a water leak so good job!
__________________
------------------------------
theMGZS.co.uk Admin
------------------------------
__________________
Some useful links:
stamford is online now   Reply With Quote
Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT. The time now is 11:52 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Copyright ? 2010 theMGZS.co.uk